Architectural services · Preston

Architectural services in Preston: what you can buy, stage by stage

Architectural services in Preston range from a single set of planning drawings to a full service that runs from the first survey to handing over the finished building. Decide which stages you need, get each one priced separately, and make sure someone is clearly responsible for the design at every stage.

The stages of a typical home project

  1. Brief and feasibility (RIBA stages 0–1). A site visit, a conversation about what you want and what it might cost, and early advice on planning constraints such as conservation areas, flood zones, trees and green belt.
  2. Measured survey. Accurate existing drawings of the house, either measured by hand or by laser scan. Everything else is drawn on top of this, so it is worth paying for properly.
  3. Concept design (stage 2). Two or three options, usually as sketches and simple 3D views, with a recommendation.
  4. Developed design and planning (stage 3). Plans, elevations and sections at the scale the council requires, a location plan and a design and access statement where needed, submitted to Preston City Council or the relevant neighbouring council.
  5. Technical design (stage 4). Building Regulations drawings, a specification and structural engineer’s calculations. This is the package builders price from.
  6. Tender and contract. Sending the package to several builders, comparing prices on a like-for-like basis, and preparing a written contract such as the JCT Homeowner contract.
  7. Construction (stage 5). Site inspections, answering builders’ questions, valuing work for stage payments and dealing with changes.
  8. Handover (stages 6–7). Snagging, the Building Regulations completion certificate, warranties and as-built information for your records.

Other services you may need alongside the architect

  • Structural engineer: calculations for beams, foundations and roof structures.
  • Building control: Preston City Council’s building control service or a registered building control approver.
  • Party wall surveyor: if a neighbour does not consent to a notice.
  • Ecologist: bat and nesting bird surveys for roof work, barns and older buildings.
  • Heritage consultant: a heritage statement for listed buildings and some conservation area schemes.
  • Arboriculturalist: where trees with Tree Preservation Orders or in conservation areas are close to the work.
  • Quantity surveyor: independent cost advice on larger projects.

Partial or full service?

A planning-only appointment keeps upfront costs down and suits simple extensions. The risk is a gap between the approved design and what gets built: the technical designer or builder may change details to suit themselves, and nobody independent checks the work on site. A full service costs more but keeps one person responsible for the design and gives you someone on your side if things go wrong. For a barn conversion, listed building or new home, a full service is usually the safer choice. Our architect fees guide compares the cost of each option, and the hiring checklist on our homepage explains how to compare practices.

Frequently asked questions

What is included in architectural services?

It depends on the stages you appoint for. A typical residential service covers a measured survey, design options, a planning application, Building Regulations drawings and specification, help choosing a builder, and inspecting the work on site. You can appoint for some stages only.

What are the RIBA stages?

The RIBA Plan of Work 2020 divides a project into eight stages: 0 Strategic Definition, 1 Preparation and Briefing, 2 Concept Design, 3 Spatial Coordination, 4 Technical Design, 5 Manufacturing and Construction, 6 Handover and 7 Use. Planning applications are usually made at the end of stage 3.

What are my duties as a homeowner under CDM 2015?

The Construction (Design and Management) Regulations 2015 apply to domestic projects, but a domestic client’s duties are normally passed to the contractor, or to the principal designer if there is a written agreement to that effect. If more than one contractor will be involved, a principal designer and principal contractor must be appointed.