Architect fees in Preston: how architects charge and what to budget
Architect fees in Preston are usually quoted in one of three ways: a percentage of the construction cost for a full service, a fixed fee for defined stages such as planning drawings, or an hourly rate for advice and small jobs. The fee depends far more on the service you buy and the complexity of the project than on the postcode.
The three ways architects charge
Percentage of construction cost
Common for full services on larger projects. The fee rises with the build cost, and is often split across the RIBA stages so you pay as each stage is completed. The percentage tends to be higher on small or complex jobs, such as work to listed buildings, because the design effort does not shrink in line with the budget.
Fixed fee
Popular for extensions and loft conversions, especially for stages 0 to 3 (up to planning). A fixed fee should come with a clear list of what is included, how many design options and revisions you get, and what happens if the council asks for changes.
Hourly or daily rate
Used for initial consultations, feasibility studies, expert advice and work that is hard to define in advance. Ask for an estimate of hours and a cap.
Estimate your fee range
This calculator is a rough, illustrative guide only. It is not based on a survey of Preston practices and is no substitute for written quotes, but it shows how project type and the stages you appoint for change the scale of the fee.
What affects an architect’s fee?
- Scope of service. Planning drawings alone cost far less than a full service with site inspections.
- Complexity. Awkward sites, steep gardens, flood zones, trees and listed buildings all add design and reporting time.
- Planning risk. Schemes in conservation areas, the green belt or open countryside may need pre-application advice and more negotiation.
- Experience and size of practice. Larger practices have higher overheads, but may bring specialist skills.
- Your decisions. Changing the brief after drawings are done is the most common cause of extra fees.
Costs that sit alongside the architect’s fee
| Item | When it applies | Where the price comes from |
|---|---|---|
| Planning application fee | Householder and full applications | Set nationally by the government; check the Planning Portal for the current figure |
| Lawful Development Certificate | Optional for permitted development | National fee, half the equivalent planning fee |
| Building control | Almost every project | Council or approver’s published charges |
| Structural engineer | Beams, foundations, lofts, barns | Quote from the engineer |
| Party wall | Work on or near boundaries | Surveyor’s fees if a neighbour dissents |
| Surveys and reports | Bats, trees, flood risk, heritage | Specialist quotes |
| Community Infrastructure Levy | New homes and some larger extensions in Preston, South Ribble and Chorley | The council’s CIL charging schedule; most householder extensions under 100 m² are exempt |
How to compare quotes
Send each practice the same brief and ask them to price the same stages. Look at what is excluded as closely as what is included: the number of design options, whether planning drawings include 3D views, whether Building Regulations drawings include a specification, and how site visits are charged. Ask for the appointment in writing before work starts. For the stages themselves, see architectural services in Preston, and for the planning costs and timescales, read the Preston planning guide.
Frequently asked questions
Do architects in Preston charge VAT?
Most practices are VAT registered, so 20% VAT is added to fees. Check whether a quote is shown with or without VAT. Building work on most extensions is also standard-rated, though some conversions qualify for reduced rates.
Is a fixed fee better than a percentage fee?
A fixed fee gives certainty if the scope is clear. A percentage fee follows the build cost, which suits projects where the scope may change. Either way, the appointment should say how extra work, such as redesign after a planning refusal, will be charged.
What other costs should I budget for besides the architect?
Typical extras are a measured survey, structural engineer, the planning application fee, building control fees, party wall costs, ecology or heritage reports where needed, and sometimes the Community Infrastructure Levy (most householder extensions under 100 square metres are exempt). Keep a contingency of 10–15% of the build cost for surprises in older houses.